Product Description
Product Description
Main description:
This production line has larger capacity and lower energy consumption. It produces high quality marshmallow products. Adopting the process formula, it can produce four color strip, square shape, watermelon shape, four twist shape and other shapes of cotton candy.
Production process:
Boiled sugar→mixed material→cooled→storage→continuous marshmallow aeration→casting→cooling→dusting→filtering→cooling conveying→sieving powder→dehumidification→packaging materials
1. Pre-mixing, all the ingredients to be dissolved and cooked.
2. Pump the basic slurry is continuously to a cooker till the final moisture level is reached.
3. After cooking, the slurry will be cooled and mixed with a separate whipping agent
4. Cooled "marshmallow base" is passed through the continuous aerator.
5).The product will be divided and injection with different colors and flavors.
6. The multi-color product is extruded, and transported on a cooling conveyor for cooling
7. The conditioned marshmallows are dusted top and bottom with starch, or a mixture of both starch and icing sugar in a separate dust cabin; the product is cut to the required length here.
Continuous filled marshmallow extruder
Main functions and purposes:
1. PLC programming automatically controls the vacuum sugar boiling temperature, time, pouring temperature, and pouring speed;
2. The large LED touch screen display is easy to operate;
3. The production capacity can reach 150 to 600 kilograms per hour;
4. Variable frequency adjustment controls the flow rate of sugar solution;
5. Sanitary structure design;
6. Continuous vacuum sugar boiling to achieve the standard for syrup pouring temperature;
7. Complete the quantitative injection and mixing of essence, pigment and acid liquid online;
8. The conveyor belt and cooling system ensure demolding;
9. Various shapes of candies can be produced according to different molds;
10. Can produce monochrome, sandwich, two-color spray, double-layer and other hard candies;
Packaging & Shipping
Completed Projects
FAQ
FAQ
Q1: How to make the mould design?
A1: According to your samples.
According to your drawings.
According to your own ideas with some photos or drawings for support.
After discussion and correction, we can finalize the mould design.
Q2: About payment terms
A2: T/T 30% of total amount as the deposit, balance 70% by T/T before shipment. 100% of irrevocable Letter of credit at sight is also acceptable.
Q3: About guarantee time
A3: One-year warranty except lifelong service. Malfunction caused by human error operation, not covered by the warranty.
During guarantee period, the cost of spare parts should be borne by us, but the freight for delivery of spare parts will be on the buyer's account.
Q4: About delivery time
A4: about 40-50 working days after receiving the deposit payment and mold drawing confirmation.
Q5: About installation & training
A5: We will dispatch one technician go to buyer's factory for on-site installation and training for five days. The buyer needs to pay $200 per day for the technician as the salary. All other expense, such as visa and round-trip tickets, food and accommodation etc will be on the buyer's account.
Q6: About package
A6: Wrapping by PE film with fumigation free wooden pallet or case.